Rough Country 5061 User Manual
Page 3

INSTRUCTION SHEET
Technical Assistance - (731) 285-9000
Page 3
5. Install the leaf spring in the new bracket with the factory bolt. See
Photo #4.
6. For the rear part of the kit a new shackle is included with the kit.
Locate this bracket. Using the supplied grease packet, lubricate the
supplied poly bushings and sleeves and install in shackle.
7. Install the shackle on the factory spring mounting location with
factory hardware.
8. Install the leaf spring in the shackle using the supplied 14mm x
110mm (4 ¼”) bolt and hardware.
9. See Photo #5.
10. Install the tires and wheels.
11. Jack up the vehicle and remove the jack stands. Lower the vehicle
to the ground.
12. Torque lug nuts to factory specifications.
13. Tighten front ½” bolts to 65 ft/lbs and rear mount 14mm bolts to
75ft\lbs on shackle inversion kit.
MAINTENANCE INFORMATION
It is the ultimate buyers responsibility to have all bolts/nuts checked for
tightness after the first 100 miles and then every 1000 miles. A qualified
professional mechanic must inspect wheel alignment steering system,
suspension and driveline systems at least every 3000 miles.
Photo 4
Photo 5