Rough Country PERF677 User Manual
Page 8

POST INSTALLATION
1. Check all fasteners for proper torque. Check to ensure there is adequate clearance between all rotating, mobile,
fixed and heated members. Check steering for interference and proper working order.
2. Re torque all fasteners after 500 miles. Visually inspect components and re torque fasteners during routine vehicle
service.
Thank you for choosing Rough Country for your Jeep off road needs.
1. Remove shifter knob by pulling the knob off the shifter. See Photo 11.
2. Lift shift boot from floor panel and remove. See Photo 12.
3. Engage
shifter
into
second and the reverse gear and mark the rubber inner shift boot as shown. See Photo 13.
4. Remove inner shift boot. Using a razor blade, begin cutting along the lines as shown. See Photo 14.
5. After cut is complete, reattach inner shift boot and push
cut section inward as shown. See Photo 15.
6. Check shifter are reinstalling the inner boot to ensure
there is no shifter interference. Modify as needed.
7. Reattach outer shift boot
8. Reattach shift knob.
INSTRUCTIONS FOR 2 AND 4 DOOR JEEP JK MANUAL TRANSMISSION