beautypg.com

VEGA VEGAMIP R62 Receiving unit - Transistor User Manual

Page 27

background image

Fig. 20: The electronics is located in the housing of the processing electronics

We recommend connecting VEGAMIP 62 in such a way that the
switching circuit is open when there is a level signal, line break or
failure (safe condition).

The terminals 1 and 5 as well as 2 and 8 are internally connected.
Hence PNP or NPN action can be selected through the electrical
connection.

1

2

Fig. 21: Wiring plan processing unit - VEGAMIP 62 (receiver) - PNP action

1

Voltage supply

2

Load

Wiring plan - processing
unit

Connection - PNP action

VEGAMIP R

62 • - Transistor

27

5 Connecting to power supply

41911

-

EN

-120228