3. Energize the Model 430 Programmer by placing the power switch
in the
I (ON) position.
4. When prompted by the Model 430 Programmer, energize the power
supplies and press ENTER on the Model 430 Programmer.
Note
The slave units must be turned on between 2 to 5 seconds after the
master, otherwise the units will fault and the power-up for both
units will have to be repeated.
Warning
All power supply parameters, both hardware and software, have
been set at the AMI factory. Power supply control, with the exception
of powering
ON
and
OFF
sequencing, is done by way of the AMI
Model 430 Power Supply Programmer. No field adjustments or
reconfiguration of the power supply should be attempted in the field
unless specifically described in this document or recommended in
writing by an AMI Technical Support Representative.
5. Enter a stability setting of 100%. Refer to sections 3.3 on page 25
6. Verify the various setup menu values for the system (with the
exception of the stability setting, which is to be temporarily left at
100%). If the power supply system was purchased with an AMI
magnet, AMI has preset the setup menu values for proper
operation. See sections 3.3, 3.5, 3.9 and 3.10 for more discussion of
the setup menu values and their entry into the Model 430
Programmer.
7. Set the Model 430 Programmer to display current (rather than
field). Refer to sections 3.2.1 and 3.7.5.
8. Set the ramp rate to 1 A/sec. Refer to sections 3.3 on page 25 and
9. Set the target current to 10 A. Refer to sections 3.3 on page 25 and
10. If a Persistent Switch is installed, set the PSw P/S Ramp Rate to 10
A/sec. Refer to paragraph 3.10.2.11 on page 56
11. Initiate ramping to the target current by pressing the
RAMP /
PAUSE
key (status indicator changes from
P
to ).