Yukc 60 – York YUHC 18-60 User Manual
Page 12
12
ENGLISH
YUKC 60
The positioning of ceiling hole and indoor unit and hanging screw bolt:
Air outlet
N-Ø200
Main body : A
Distance between bolts: B
J=MxK
Hanging Screw bolt
4-M10 Site configuration
70
440-640
150
Ceiling hole: D
C
Panel: E
60 80
H
5
Capacity (Btu/h)
A
B
C
D
E
F
G
H
I
J
K
M
N
60000
1350 1400 1380 1400 1430
19
12.7 252
35
930
310
3
4
When using a back-air installation, please refer to the following:
Back panel layout
A
B
205
300
I
I
Back panel layout
A
250
320
127
N-250x393.8
Main body: 800
300
720
630
Connecting point of cold
medium pipe
(Air side ØF)
Connecting point
of drain pipe
Ceiling hole 470
450
Panel 500
Dust proof net
(Additional purchase)
Canvas air passage
(Additional purchase)
Panel
(Additional purchase)
100
30
335
305
210
80
Entrances and exits
for communication
lines of indoor and outdoor units
155
120
90
170
320
Ø125 Plank (inside)
(For air delivery from outside)
Fixed screw
Connecting point of cold
medium pipe
(liquid side ØG)
300
70
Install the main body:
Distance between bolts: 565
210
YUKC 18-48
YUKC 60
J368-EN.indd 12
2/1/07 9:41:13 AM