beautypg.com

Wayne-Dalton 341785 User Manual

Page 22

background image

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.

To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at

www.wayne-dalton.com

22

Tools Needed:

Tools Needed:

14

15

End Brackets

NOTE: Right and left hand is always
determined from inside the garage
looking out.

End bearing brackets are right and left.
align bottom edge of left end bracket
with the top edge of the flagangle.
Maintaining this alignment, also align
the right edge of the end bracket with
the right edge of the flagangle.

secure end bracket to the jamb using
(3) 5/16” x 1-5/8” lag screws as shown.
Repeat for the other side.

Power Drill

7/16” socket

Driver

Center Bearing Bracket

Power Drill

7/16” socket

Driver

level

Tape Measure

Pencil

1/4” Torx bit

Measure to locate the center of the door

and mark a vertical pencil line on the

mounting surface above the door, to

indicate the center line of the door. Then,

measure from the center of the bearing, in

one of the end bearing brackets, DOWN to

the top of the door. using that dimension,

measure uP from the top of the door

and mark a horizontal pencil line on the

mounting surface, intersecting the vertical

pencil line. Now align the edge of the center

bearing bracket along the vertical pencil

line on the mounting surface. Center the

bearing bracket on the horizontal line. This

will ensure the torsion tube is level between

the center and end bearing brackets. attach

the center bearing bracket, in this location,

to the mounting surface, using (2) 5/16”

x 1-5/8” lag screws and (1) 5/16” x 2”

tamper-resistant lag screw.

IMPORTANT: usE ThE 5/16” x 2” TaMPER-

REsIsTaNT laG sCREW ONly IF MOuNTING

suRFaCE MOuNTED OVER MasONRy.

TaMPER-REsIsTaNT laG sCREW MusT bE

aTTaChED ThROuGh ThE bOTTOM hOlE

OF ThE CENTER bEaRING bRaCkET.

VERTICal lINE

MOuNTING suRFaCE

Equal DIsTaNCE

CENTER OF

END bEaRING

bRaCkET

hORIzONTal lINE

CENTER bEaRING

bRaCkET

CENTER

bEaRING

bRaCkET

(1) 5/16” x 1-5/8” laG sCREW

(1) 5/16” x 2”

TaMPER-REsIsTaNT laG

sCREW

(1) 5/16” x 1-5/8” laG sCREW

MOuNTING
suRFaCE

hORIzONTal lINE

VERTICal

lINE

TOP sECTION

lEFT haND END

bRaCkET

(3) 5/16” x 1-5/8”

laG sCREWs

TOP sECTION

lEFT haND END

bRaCkET