beautypg.com

Wayne-Dalton 341785 User Manual

Page 15

background image

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.

To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at

www.wayne-dalton.com

15

Tools Needed:

Tools Needed:

INST

ALLA

TION

Bottom Section

before installing the bottom section,
the weather seal (may not be included)
must be installed (see PREPaRING ThE
OPENING on page 10)

Center the bottom section in the door
opening. level section using wooden
shims (if necessary) under the bottom
astragal.

level

6

bOTTOM
sECTION

DOOR OPENING

WEaThER sEal

WOODEN shIMs

(IF NECEssaRy)

lEVEl

Vertical Track

IMPORTANT: ThE TOPs OF ThE
VERTICal TRaCks MusT bE lEVEl
FROM sIDE TO sIDE. IF ThE bOTTOM
sECTION Was shIMMED TO lEVEl IT.
ThE VERTICal TRaCk ON ThE shIMMED
sIDE, MusT bE RaIsED ThE hEIGhT OF
ThE shIM.

Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers and
the door jamb. Drill 3/16” pilot holes
for the lag screws. loosely fasten
jamb brackets and flagangles to the
jamb using 5/16” x 1-5/8” lag screws.
Tighten lag screw securing bottom
jamb bracket to jamb, to maintain 5/8”
spacing. Repeat for the right side.

bOTTOM
sECTION

bOTTOM sECTION

VERITCal TRaCk

ROllER

5/16” x 1-5/8”

laG sCREWs

FlaGaNGlE

VERTICal

TRaCk

assEMbly

jaMb

bRaCkET

3/16” Drill bit

Power Drill

7/16” socket

Driver

Tape Measure

level

5/8”

7

quICk INsTall aND Fully aDjusTablE

FlaGaNGlE laG lOCaTIONs

laG

sCREW

lOCaTIONs

laG

sCREW

quICk INsTall

jaMb bRaCkET