beautypg.com

Trango Broadband M5580M-FSU User Manual

Page 24

background image

Deployment & Installation

Trango Broadband Wireless — M5580M-FSU (Atlas Fox) User Manual Revision 2

page 20

Freq 5788 MHz -98 / -98 -99 / -99
Freq 5792 MHz -85 / -98 -99 / -99
Freq 5796 MHz Ch 4 -79 / -98 -99 / -99

(Survey Cont.)

Freq 5800 MHz -80 / -98 -99 / -99
Freq 5804 MHz -98 / -98 -99 / -99
Freq 5808 MHz -98 / -98 -99 / -99
Freq 5812 MHz -77 / -98 -99 / -99
Freq 5816 MHz Ch 5 -98 / -98 -99 / -99
Freq 5820 MHz -79 / -98 -99 / -99
Freq 5824 MHz -98 / -98 -99 / -99
Freq 5828 MHz -98 / -98 -99 / -99
Freq 5832 MHz -98 / -98 -99 / -99
Freq 5836 MHz Ch 6 -98 / -98 -99 / -99
Freq 5840 MHz -98 / -98 -99 / -99
Success.
#>


The results will display signal levels for each frequency in intervals of 4MHz for each channel. Select the channel with
lowest signal levels.

Note: Each Channel is 20MHz wide.

When selecting a channel, make sure to review 10MHz above and 10MHz below. As an example, Ch 5 covers
frequencies 5806 to 5826. This channel is not clear. Frequency 5812 has a noise level of -77dBm. This noise level will
interfered with your signal resulting in poor performance. Chanel 6 is a better choice.

Channel Planning

Based on the results of the site survey at each end of the link, choose a channel with the lowest noise floor. A clean spectrum is
essential for proper performance. It is recommended to maintain a 10dB fade margin or separation from the noise floor for
best performance.

RSSI Command and Antenna Alignment

Once the site survey is completed, you are ready to install your radios. Typically it is best to install the AP

first.

To properly align the radios, use the built-in RSSI tool to achieve maximum signal strength.

1.

Ensure SU is in Opmode “ON”

2.

Connect to the SU.

3.

Login and type the command rssi. As you read the RSSI, move the antenna in

the horizontal and vertical planes until the maximum RSSI reading is achieved

4.

If it is not possible to receive an adequate RSSI reading, it may be necessary to

reorient the SU (up/down, left/right), to increase the output power of the AP, or
to move the

SU to a location with better line-of-sight conditions to the AP.

5.

Once you are satisfied with the RSSI reading, tighten down the SU in the

optimum position.