G9000 Installation and Operation Manual

69

C)

Bypass Operation Procedure

** Transfer from Inverter to Bypass

1. Check for

“SYNC” on the LCD.

2. Press the "START/ST

OP” icon on the LCD.

3. Follow the

“SHUTDOWN GUIDANCE” and Press the "STOP" icon on the LCD.

** Transfer from bypass to inverter.

UPS

1. Press the "START/STOP" icon on the LCD.
2. Follow the

“STARTUP GUIDANCE” and Press the "START" icon on the LCD..


When "REMOTE OPERATION MODE" is displayed on the LCD panel, the inverter

start operation can only be performed remotely. If local inverter start or stop operation is

required (at the UPS), select "LOCAL ONLY" or “REMOTE & LOCAL” in the

OPERATION MENU.



!