B) Shut-down Procedure

If a total UPS shutdown is required, verify that the critical load is OFF.

a.) Press the "START/STOP" icon from the Main Menu or the Operation Menu on the LCD.

b.) On the LCD panel, press

“START/STOP” icon, and then select “SHUTDOWN GUIDANCE” icon.

(Refer to Figure 2.3)

c.) Follow the

“SHUTDOWN GUIDANCE” until Inverter stops. The UPS will simultaneously transfer

to Bypass operation.

d.) In general, only the Inverter will be stopped and the Converter will remain energized to charge the

batteries.

When "REMOTE OPERATION MODE" is displayed on the LCD panel, the inverter

start operation can only be performed remotely. If local inverter stop operation is

required (at the UPS), select "LOCAL ONLY" or “REMOTE & LOCAL” in the

OPERATION MENU.

e.) If stopping both the Inverter and Converter is required, open the Battery Disconnect circuit

breaker (CB2) manually in accordance with guidance.

Verify the load is OFF if the next step is to be performed.

Power to the load has been supplied through the bypass line. Power to load will be lost

after execution of the next step. The load will drop.

f.) If a dual source is feeding the UPS, open the External AC Input Circuit Breaker (user supplied)

manually.

g.) If turning off all power to the critical load is desired, open the External Bypass Input Circuit

Breaker (user supplied) manually.

In bypass mode, all UPS power terminals are still alive. Lethal voltages are present.

De-energize all external sources of AC and DC power. Before removing the covers, wait

5 minutes after de-energizing. Check no-voltage before handling UPS. Be careful of

the devices even when the UPS has been de-energized, since internal devices may be

energized.

!