beautypg.com

Toshiba G9000 User Manual

Page 19

background image

G9000 Installation and Operation Manual

9

In the event of a UPS module failure during Parallel Operation, the critical load power will be

continually supplied and shared by all other UPS.

The Bypass Input breaker and cables are to be supplied and installed by the user or

the constructor. (See WARNING 4 on page 5)

B) Bypass Operation: Load Power supplied through UPS internal static bypass line.

FIGURE 1.2 Single Line Diagram - Bypass Operation: Load fed through static bypass line.

Bypass

Input

CB

User supplied

MCCB

52S

AC

Input

CB1

CONVERTER

INVERTER

52C

Output

Power Flow

Not in Use

UPS Module

Battery

Cabinet

CB

User supplied

MCCB

CB2

External

Battery

CB3

CB

Static Transfer

Switch

CHARGER

Figure 1.2 shows the Internal Bypass line is a Hard-wired line through 52S which supplies the

critical load with unconditioned bypass input power. Upon switching to the Internal Bypass line, the

Static Transfer Switch line through CB3 (herein after STS contactor CB3) supplies the power

immediately, and then the Internal Bypass line through 52S supplies the power. In the event of a

switching to the Bypass line, the power to the critical load will be uninterrupted. The purpose of this

Internal Bypass line is to route power to the critical load while the UPS module is de-energized

(converter and inverter), and during Start-up before the system is fully operational.

Each UPS internal static bypass line will equally share the power supplied to the critical load

whenever the system is in the Parallel Operation.

!

NOTE