beautypg.com

Toshiba G9000 User Manual

Page 74

background image

64

G9000 Installation and Operation Manual

FIGURE 3.7.2 Diagram of Power Wire & Control Wire Connections for 2 units in MMS Configuration

(300-750kVA)

IFAU-09

CN99

CN98

TLBIN

ON

TLAIN

TN1

IOAU-09

5

6

AC

OUTPUT

UPS-1

A
B
C

UPS-1

A
B
C

UPS-2

AC OUTPUT

47
48
49
50

52L1-AX

52L2-AX

Toshiba Tie Cabinet (TTC)

A50
B50
C50

CN97

CN96

TLBOUT

TLAOUT

CN954

CN953

CB2IN

CB1IN

CN952

CN951

CA2IN

CA1IN

CN944

CN943

CB2OUT

CB1OUT

CN942

CN941

CA2OUT

CA1OUT

ON

IFAU-09

CN99

CN98

TLBIN

ON

TLAIN

TN1

IOAU-09

5

6

AC

OUTPUT

UPS-2

A50
B50
C50

CN97

CN96

TLBOUT

TLAOUT

CN954

CN953

CB2IN

CB1IN

CN952

CN951

CA2IN

CA1IN

CN944

CN943

CB2OUT

CB1OUT

CN942

CN941

CA2OUT

CA1OUT

ON

*1

*2

*2

*2

*2

*1

Use Ethernet STP
(Shielded Twisted
Pair) Cable for all
communication
cabling.
Use of UTP
(Unshielded Twisted
Pair) Cable may
cause malfunction.

Total cable length
from UPS-1 to UPS-2
should be within
100m.

*1 Return from the last

UPS module to the first UPS
module (continuous loop).

*2 DIP switch position

UPS-1 and UPS-2 : ON