beautypg.com

Start-up, Pre start-up – Raypak Hi Delta 992B-1262B User Manual

Page 52

background image

52

START-UP

Pre Start-up

Filling System (Heating Boilers)

Fill system with water. Purge all air from the system.
Lower system pressure. Open valves for normal sys-
tem operation, and fill system through feed pressure.
Manually open air vent on the compression tank until
water appears, then close vent.

Air Purge (Domestic Hot Water
Heaters)

Purge all air from system before lighting heater. This
can be normally accomplished by opening a down-
stream valve.

Venting System Inspection

1.

Check all vent pipe connections and flue pipe ma-
terial.

2.

Make sure vent terminations are installed per code
and are clear of all debris or blockage.

For Your Safety

This appliance has a hot surface igniter. It is equipped
with an ignition device which automatically lights the
burners. Do not try to light the burners by hand.

BEFORE OPERATING, smell all around the appliance
area for gas. Be sure to smell near the floor because
some gas is heavier than air and will settle on the floor.

WHAT TO DO IF YOU SMELL GAS:

Do not try to light any appliance.

Do not touch any electrical switch; do not use any
telephone in your building.

Immediately call your gas supplier from a neigh-
bor’s telephone. Follow the gas supplier’s
instructions.

WARNING: If you do not follow these instructions
exactly, a fire or explosion may result causing
property damage, personal injury or loss of life.

If you cannot reach your gas supplier, call the fire
department.

Use only your hand to push in or turn the gas con-
trol knob. Never use tools. If the knob will not turn
by hand, do not try to repair it, call a qualified serv-
ice technician. Forced or attempted repair may
result in a fire or explosion.

Do not use this appliance if any part has been
under water, immediately call a qualified service
technician to inspect the appliance and to replace
any part of the control system and any gas control
which has been under water.

Check around unit for debris and remove com-
bustible products, i.e. gasoline, etc.

Pre Start-up Check

1. Verify heater is filled with water.

2. Check system piping for leaks. If found, repair

immediately.

3. Vent air from system. Air in system can interfere

with water circulation.

4. Purge air from gas line up to heater.

Initial Start-up

Tools Needed

(1) 12-0-12, 24” scale U-tube manometer

(4) 6-0-6, 12” scale U-tube manometers (mini-
mum)

(1) Screwdriver

(1) Multi-meter

(1) 3/16” Allen wrench

NOTE: Digital manometers are not recommended.