beautypg.com

Raypak Hi Delta 992B-1262B User Manual

Page 48

background image

48

The stainless steel direct vent cap must be furnished
by the boiler manufacturer in accordance with its list-
ing (sales order option D-15).

Use only double-wall vent pipe and the special gas
vent pipes listed for use with category II or IV gas burn-
ing boilers, such as the stainless steel Saf-T vent by
Heat Fab Inc. (800-772-0739), Protech Systems Inc.
(800-766-3473), Z-Flex (800-654-5600) or American
Metal Products (800-423-4270). Pipe joints must be
positively sealed. Follow the vent manufacturer’s
installation instructions carefully.

Direct Vent - Horizontal Through-
the-Wall

Installation

These installations utilize the boiler-mounted blower to
draw combustion air from outdoors and vent combus-
tion products to the outdoors.

The total length of the direct vent through-the-wall
exhaust vent cannot exceed 40 ft in length for the flue
outlet. Each elbow used is equal to 10 ft of straight
pipe. This will allow installation in one of the three fol-
lowing combinations:

40’ of straight flue pipe

30’ of straight flue pipe and one elbow

20’ of straight flue pipe and two elbows

The total length air supply duct cannot exceed the dis-
tances listed. Each elbow used is equal to 10 ft of
straight pipe. This will allow installation in one of the
three following combinations:

40’ of straight combustion air pipe

30’ of straight combustion air pipe and one elbow

20’ of straight combustion air pipe and two elbows

The flue exhaust direct vent cap is not considered in
the overall length of the venting system.

Care must be taken during assembly that all joints are
sealed properly and are airtight.

The vent must be installed to prevent the potential ac-
cumulation of condensate in the vent pipes. It is
recommended that:

1.

The vent must be installed with a slight downward
slope of not more than 1/4 inch per foot of hori-
zontal run to the vent terminal.

2.

The vent must be insulated through the length of
the horizontal run.

For installations in extremely cold climate, it is rec-
ommended that:

1.

The vent must be installed with a slight upward
slope of not more than 1/4 inch per foot of hori-
zontal run to the vent terminal. In this case, an
approved condensate trap must be installed per
applicable codes.

2.

The intake vent must be insulated through the
length of the horizontal run.

Common Venting System

Common venting of Category IV systems is not al-
lowed.

The stainless steel flue exhaust direct vent cap must
be furnished by the boiler manufacturer in accordance
with its listing (sales order option D-15).

Use only double-wall vent pipe and the special gas
vent pipes listed for use with category II or IV gas burn-
ing boilers, such as the stainless steel Saf-T vent by
Heat Fab Inc. (800-772-0739), Protech Systems Inc.
(800-766-3473), Z-Flex (800-654-5600) or American
Metal Products (800-423-4270). Pipe joints must be
positively sealed. Follow the vent manufacturer’s
installation instructions carefully.

Fig. 43: Direct Vent - Horizontal Through-the-Wall

WARNING: No substitutions of flue pipe or vent
cap material are allowed. Such substitutions would
jeopardize the safety and health of inhabitants.