beautypg.com

Clearances – Raypak Hi Delta 992B-1262B User Manual

Page 11

background image

11

In addition, the heater shall be installed such that the
gas ignition system components are protected from
water (dripping, spraying, rain, etc.) during appliance
operation or service (circulator replacement, control
replacement, etc.).

Clearances

Indoor Installations

Heater

Side

Minimum Clearance

from Combustible

Surfaces

Recommended

Service

Clearance

Floor*

0”

0”

Rear

1”

24”

Water Side

12”

24”

Other Side

1”

24”

Top

1”

1”

Front

Open

24”

Vent

2”

2”

Table E: Clearances – Indoor Installations

TOP VIEW

FRONT VIEW

Venting not shown for clarity. Heater must be vented

per instructions in this manual

Fig. 7: Minimum Clearances from Combustible

Surfaces – Indoor Installations

When installed according to the listed minimum clear-
ances from combustible construction, these heaters
can still be serviced without removing permanent
structural construction around the heater. However, for
ease of servicing, we recommend a clearance of at
least 24 in. in front, and at least 12 in. on the water
connection side. This will allow the heater to be serv-
iced in its installed location without movement or
removal of the heater.

Service clearances less than the minimums may
require removal of the heater to service either the heat
exchanger or the burner tray. In either case, the heater
must be installed in a manner that will enable the
heater to be serviced without removing any structure
around the heater.

Outdoor Installations

These heaters are design-certified for outdoor installa-
tion. Heaters must not be installed under an overhang
that is less than 3 ft from the top of the heater. Three
sides must be open in the area under the overhang.
Roof water drainage must be diverted away from
heaters installed under overhangs.

Heater

Side

Min. Clearance

from Combustible

Surfaces

Recommended

Service

Clearance

Front

Open

24”

Rear

12”

24”

Water Side

36”

36”

Other Side

36”

36”

Top

Unobstructed

Unobstructed

Vent

N/A

N/A

Table F: Clearances – Outdoor Installations

These clearances are required when the outdoor
vent cap is used. If installing the heater outdoors
with a vent stack, the indoor clearances may be
utilized.

The combustion air intake hood MUST be used for
outdoor installations. The hood is shipped loose and
installed on the side of the heater over the filter box at
the jobsite.

* DO NOT install on carpeting.