beautypg.com

Startup procedure for inband management, Startup procedure for out-of-band management, Startup procedure for inband management -5 – Paradyne IP DSLAM BitStorm 2600 User Manual

Page 41: Startup procedure for out-of-band management -5

background image

4. Configuration

2600-A2-GN20-40

March 2005

4-5

Startup Procedure for Inband Management

With inband management, the BitStorm 2600 is managed using the uplink port.

Procedure

To start up the BitStorm 2600 using inband management:

1. Specify the uplink port using the configure uplink command. It must be either

eth2 (Port 2) or eth3 (Port 3). For example:

PDYN# configure uplink eth3

2. Assign an IP address, netmask, and next-hop router using the configure

management command. For example:

PDYN# configure management inband address 137.90.127.3
255.255.255.0

PDYN# configure management default-gateway
137.90.127.1

Do not configure inband and out-of-band management on the same subnet.

Startup Procedure for Out-of-Band Management

In out-of-band management, you manage the unit through Port 1.

Procedure

To start up the BitStorm 2600 using out-of-band management:

1. Assign an IP address, netmask, and next-hop router using the configure

management command. For example:

PDYN# configure management out-of-band address
137.90.80.3 255.255.255.0

PDYN# configure management default-gateway 137.90.80.1

You can now access the web interface by typing into the Location field of your
web browser the IP address assigned to the Port 1. See

Using the Web

Interface

on page 4-6.

Do not configure inband and out-of-band management on the same subnet.

2. Configure routers as necessary to route data from the NOC to the

BitStorm 2600.