beautypg.com

Quickdraw, Boiler water heater – PVI Industries QUICKDRAW PV500-26 User Manual

Page 6

background image

QUICKDRAW

Boiler Water Heater

6

PV500-26 06/12

3

STANDARD FEATURES AND EQUIPMENT

3.1 Warranty

Factory warranty does not cover improper installation or operation. (See warranty for complete details). Warranty
exclusions include but are not limited to failure or malfunctions resulting from:

1. Failures to properly apply, install, operate, or maintain the appliance in accordance to printed instructions.

2. Abuse, alteration, accident, fire, flood and the like.

3. Sediment or lime buildup, freezing or any other conditions causing inadequate circulation.

4. Corrosive or contaminated atmosphere.



4

WATER HEATER INSTALLATION

4.1

Checking Equipment Before You Install

Inspect the unit completely upon receipt from the freight carrier before signing the bill of lading. Inspect the
appliance and all accompanying parts for signs of impact or mishandling. Verify the total number of pieces shown
on packing slips with those actually received. Contact the freight carrier immediately if any damage or shortage is
detected.

4.2 Codes

The equipment shall be installed in accordance with the instructions in this manual, appliance markings and
supplemental instructions and in compliance with those installation regulations in force in the local area where the
installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be
consulted before installation is made. All appliances conform to the latest edition of the ASME Boiler and Pressure
Vessel Code, Section IV, Part HLW.

4.3 Electrical

The heater is wired for 120VAC/1ph/60Hz volts and must be electrically grounded in accordance with local codes,
or in the absence of local codes, with the latest edition of the National Electrical Code ANSI/NFPA. When unit is
installed in Canada, it must conform to the CSA C22.1, Canadian Electrical Code (CEC), Part 1 and/or local
electrical codes.

1. Branch circuit protection and disconnecting means must be furnished by the installer. Refer to the wiring

diagram provided with this unit when installing or troubleshooting the electrical components of this heater.

2. All wiring must be in accordance with all local, state, or federal codes.

3. Provide proper overload protection for the system’s circulating pump.

Note: Use only copper wire of proper sizing for incoming service. The warranty on this unit does not cover damage
resulting from the use of aluminum wiring.

4.4 Location

1. Locate the unit in a clean and dry area as close as possible to the greatest hot water usage and as near to

boiler water and/or electrical power as practical.

2. Install the unit on a firm, level foundation.

3. Locate the foundation on a pitched floor near a suitable drain, or make other provisions to prevent contact to

areas of the building subject to water damage should the boiler or a water connection leak.

4. The drain must be sufficient to contain water in excess of 210°F.