beautypg.com

Lenovo THINKSERVER 3797 User Manual

Page 213

background image

the instructions in this topic; use the instructions in “Installing a PCI adapter” on
page 180
and “Removing a PCI adapter” on page 179.

To install a SAS controller on the SAS riser card, complete the following steps:

1. Make sure that the server is turned off, all external cables and power cords are

disconnected, and the cover has been removed.

2. If you are installing a new or replacement SAS controller, touch the

static-protective package that contains the new SAS controller to any unpainted
metal surface on the server. Then, remove the SAS controller from the package.

1

SAS riser card

2

RAID adapter

3. If you are installing a new or replacement SAS controller that uses a battery,

complete the following steps:

a. Remove the battery from the SAS controller package or the battery

package.

b. Install the battery and connect the battery to the SAS controller as instructed

in the documentation that comes with the SAS controller or the battery.

4. If the new SAS controller is a different physical size than the SAS controller you

removed, you might have to move the controller retention bracket (tape-enabled
model servers only) to the correct location for the new SAS controller. See
“Moving the SAS-controller retention bracket” on page 206; then, continue with
the next step in this procedure.

5. Turn the SAS controller so that the keys on the bottom edge align correctly with

the connector on the SAS riser card in the SAS controller assembly.

6. Firmly press the SAS controller horizontally into the connector on the SAS riser

card.

7. (Tape-enabled model server only) Gently press the opposite edge of the SAS

controller into the controller retention bracket.

8. Install the SAS riser card and controller assembly (see “Removing the SAS riser

card and controller assembly” on page 200).

If you have other optional devices to install or remove, do so now. Otherwise, go to
“Completing the installation” on page 227.

Notes:

1. When you restart the server for the first time after you install a SAS controller

with a battery, the monitor screen remains blank while the controller initializes
the battery. This might take a few minutes, after which the startup process
continues. This is a one-time occurrence.

Important: You must allow the initialization process to be completed. If you do
not, the battery pack will not work, and the server might not start.

Chapter 6. Removing and installing FRUs

205

This manual is related to the following products: