beautypg.com

5 commissioning, 1 initial startup, Commissioning – Siemens Industrial PC Simatic Panel PC 677B User Manual

Page 25

background image

SIMATIC Panel PC 677B
Operating Instructions (Compact), 06/2008, A5E02217246-01

25

Commissioning

5

5.1

Initial Startup

Configuring the operating system

Note
Requirements for initial start-up
Before switching on the computer for the first time, check that the equipotential bonding is

connected and that all connecting cables are plugged in correctly. Also ensure that a USB

keyboard and a USB mouse are connected to the PC.

When the computer starts up for the first time, the Windows 2000 / Windows XP Professional

/ Windows Vista operating system on the hard disk is configured automatically. Procedure:
1. Connect the device to the power supply.

– The module carries out a self-test. The following message appears:

Press to enter Setup or to show Boot menu

2. Wait for the message to disappear.
3. Follow the instructions on the screen.

NOTICE

The device may not be switched off at any time during the installation process.
Do not change the default BIOS settings, otherwise the operating system setup may

become corrupted.

4. When you have entered all necessary information and the operating system setup is

completed, the PC is reboots automatically and the user interface of the respective

operating system is displayed.

Note
System startup can take longer than usual for the initial commissioning.

When you switch on the PC now, the user interface of the Windows 2000 / Windows XP

Professional / Windows Vista operating system is automatically opened when the startup

routine is completed.