Locate PDU in dry area.

Rack Mount in equipment rack using mounting brackets.

Restricted Access Location not required.

This PDU relies on protective devices in the building installation

for short circuit and over current protection.

Elevated Operating Ambient- If installed in a closed or multi-unit

rack assembly, the operating ambient temperature of the rack

environment may be greater than room ambient. Therefore,

consideration should be given to installing the equipment in an

environment compatible with the maximum ratings of the product.

Reduced Air Flow- Installation of the equipment should be such

that the amount of airflow required for safe operation of the

equipment is not compromised.

Mechanical Loading- Mounting of the equipment in the rack should

be such that a hazardous condition is not achieved due to uneven

mechanical loading.

Circuit Overloading- Consideration should be given to the

connection of the equipment to the supply circuit and the effect

that overloading the circuits might have on over current protection

and supply wiring. Appropriate consideration of equipment

nameplate ratings should be used when addressing this concern.

Reliable earthing of equipment should be maintained. Particular

attention should be given to supply connections other than direct

connections to the branch circuit (e.g. use of power strips).

Consult the local electrical code for additional information.