beautypg.com

Installing additional equipment, Verifying site requirement, Installing additional equipment -2 – SMC Networks VDSL2 User Manual

Page 40: Verifying site requirement -2, Figure 3-2, Wiring after switch installation -2, 2 installing additional equipment, Nstalling, Witch

background image

I

NSTALLING

THE

S

WITCH

3-2

Installing Additional Equipment

The VDSL switch should be installed close to the PBX, punch-down
blocks, and patch panels, usually in the basement or wiring closet. You may
also want to install a rack for distribution equipment (switches, routers
etc.), and extra punch-down blocks or patch panels for flexibility and
future applications or expansion.

An optional patch panel can be used to connect the circuits between the
switch and the punch-down blocks. If a patch panel is not used, the switch
connects directly to the PBX for the incoming phone lines and the
punch-down block used for the VDSL lines running up to the end users.
In this case, the punch-down blocks must have an RJ-21 connector.

Figure 3-2 Wiring after Switch Installation

Verifying Site Requirement

Before you start installing the switch, make sure you can provide the right
operating environment, including power requirements, sufficient physical
space, and proximity to other network devices that are to be connected. Be
sure to follow the guidelines below when choosing a location.

100 240V 50 60Hz 1A

-

-

Console

1

2

3

4

5

6

7

8

9

10

11

12

14

13

15

16

17

E

O

18

E

O

Power

Fault

Diag

Mgmt

Line

Mgmt

O

E

17

O

E

18

POTS

ESD PORT

S M C 7 8 1 6 M

V S W

/

TigerAccess

EE Switch

TM

100 240V 50 60Hz 1A

-

-

Console

1

2

3

4

5

6

7

8

9

10

11

12

14

13

15

16

17

E

O

18

E

O

Power

Fault

Diag

Mgmt

Line

Mgmt

O

E

17

O

E

18

POTS

ESD PORT

S M C 7 8 1 6 M

V S W

/

TigerAccess

EE Switch

TM

w it c h 10 /1 0 0

6 7 2 4 L 3

w it c h 10 /1 0 0

6 7 2 4 L 3

Punch-Down Blocks
Connecting to Clients

PBX

Telephone Line
from Central Office

Existing Phone
Lines to Clients

Upper Floors

Basement

MPOE

Switches