SERVICING

65 COMBUSTION CHAMBER INSULATION REPLACEMENT

1

Rear

Front

Combustion

chamber

LH Side

RH Side

nm8748

7

6

5

The insulation boards used in the combustion chamber of
this product are made of high temperature glass fibres with a
binder of organic and inorganic materials.

Ideal Stelrad Group recommend that, for your own comfort
and safety and to comply with good working practice, the
procedure described below is followed:

1. Refer to Frame 52.

2. Remove the boiler front and sealing panels. Refer to

Frames 45 & 46.

3. Remove the fan / venturi assembly. Refer to Frame 54.

4. Remove the burner. Refer to Frame 48.

5. Remove the ignition electrode. Refer to Frame 56.

6. Remove the flame detection electrode. Refer to Frame 52.

7. Remove the front and rear ionisation probes.

Prior to removal of the board the following protective
equipment should be worn:

z

Face mask supplied with the spare part.

z

Gloves supplied with the spare part.

8. Damp down the combustion chamber area containing the

insulation boards.

9. Remove the split pin and washer from the RHS of the

combustion chamber.

10. Remove the insulation boards. The replacement boards

are supplied in a plastic bag. This bag should be retained
and the discarded boards should now be placed into it.

11. Sweep any dampened particles and place in the plastic

bag.

12. Fit new insulation boards.
Note.

The boards are designed to be interlocking and should be
fitted as shown.

13. Fit the new split pin and washer in the RHS of the

chamber.

14. Remove the gloves and face mask and place them in the

plastic bag.

15. Wash your hands and any areas of skin which may have

come into contact with any of the particles from the
insulation board.

Note. Seal the plastic bag and dispose of it and its contents

into a commercial tip.

16. Reassemble in reverse order, remembering to re-fit the

ionisation probes first.

17. Check operation of the boiler. Refer to Frame 52.

Fit insulation in the following order:

1.

Rear.

2.

Left Hand Side.

3.

Front.

4.

Right Hand Side.

SER

VICING