beautypg.com

36 icos, Servicing, 52 replacement of components – IDEAL INDUSTRIES ICOS HE18 User Manual

Page 36: Ser vicing

background image

36

icos -

Installation & Servicing

SERVICING

GENERAL

When replacing ANY component:

1. Isolate the electricity supply.

2. Turn off the gas supply.

3. Remove the boiler front panel. Refer to Frame 40.

After replacing ANY component check operation of the boiler
including gas soundness, gas rate and combustion test.

THE BOILER MUST NOT BE OPERATED WITHOUT THE SEALING PANEL FITTED

53 CONTROL THERMISTOR REPLACEMENT

1. Refer to Frame 52.

2. Remove the boiler front and sealing panels. Refer

to Frames 45 & 46.

3. Pull the electrical leads off the control thermistor.

4. Pull the control thermistor and spring clip off the

IMPORTANT

When work is complete, the sealing panel must be
correctly fitted, ensuring that a good seal is made.

Note.

In order to assist fault finding, the control panel has an
LED diagnostic display. The key to boiler fault
conditions is shown in Frame 69.

52 REPLACEMENT OF COMPONENTS

flow pipe.

5. Replace thermistor and

reconnect leads, ensuring that
the spring clip is securely
holding the thermistor to the
flow pipe.

6. Reassemble the boiler in

reverse order.

7. Check the operation of the

boiler. Refer to Frame 52.

nm8753

SER

VICING

This manual is related to the following products: