beautypg.com

Flue outlet, 26 icos, Installation – IDEAL INDUSTRIES ICOS HE18 User Manual

Page 26: 32 assembling the roof flue kit

background image

26

icos -

Installation & Servicing

INSTALLATION

FLUE OUTLET

32 ASSEMBLING THE ROOF FLUE KIT

Determine the correct height that the flue should terminate
above the roof. If after calculating or measuring the overall flue
height from the top of the boiler, it is necessary to cut both
pipes of assembly A, then ensure they are cut equally leaving
the inner flue tube longer than the outer air tube as supplied.

Ensure the cut pipe ends are free from any burrs.

1. Position the roof flashing plate (supplied separately) over the

hole cut in the roof and insert flue terminal from the roof end.

nm8739

min 16

o

max 41

o

MAX LENGTH:

7.5m

BOILER

nm8740

Flue Terminal

Pitched roof tile

weather collar

Flat roof tile

weather collar

1

nm8741

2

Extension
Duct

Vertical
connector

Turret
clamp

3

nm8743

'X'

4

2. Push fit the vertical connector (supplied seperately) into the

boiler flue connection and retain with the turret clamp and
securing screw (supplied with the boiler). ENSURING THE
GASKETS IN THE BOILER FLUE OUTLET ARE CORRECTLY
FITTED.

3. "Push" fit extension duct (if required (supplied separately)) into

vertical connector.

4. If the last extension duct requires cutting, measure ‘X’, the distance

(outer ducts), between the duct and the terminal and add 100 mm to
this dimension. This gives the length of the last extension duct.

Note. Check the position of the inner flue duct relative to the outer duct
on the assembled extension duct(s) and ensure the terminal flue duct
is cut longer than the air duct to ensure engagement in the final flue
duct seal.

5. Finally ensure the roof flashing plate is correctly sealed to the roof.

This manual is related to the following products: