beautypg.com

41 icos, Servicing, Ser vicing – IDEAL INDUSTRIES ICOS HE18 User Manual

Page 41

background image

41

icos -

Installation & Servicing

SERVICING

1. Refer to Frame 52.

2. Remove the boiler front and sealing panels. Refer to Frames 45 & 46.

3. Pull off the silicon tube from the thermistor housing.

4. Remove the aluminium nipple securing the thermistor to the flue manifold.

5. Withdraw the thermistor.

6. Unplug the inline electrical connector.

7. Fit the new thermistor, using the gasket supplied.

8. Reassemble in reverse order.

9. Check operation of the boiler. Refer to Frame 52.

1. Refer to Frame 52.

2. Remove the boiler front and

sealing panels. Refer to Frames
45 & 46.

3. Pull off the electrical leads from

the thermostat body.

4. Pull the thermostat and clip from

the pipe.

5. Fit the new thermostat, ensuring

that the clip is securely holding
the thermostat to the flow pipe.

6. Reassemble in reverse order.

7. Check operation of the boiler.

Refer to Frame 52.

63 OVERHEAT THERMOSTAT REPLACEMENT

64 FLUE THERMISTOR REPLACEMENT

nm8746

nm8747

3

4

SER

VICING

This manual is related to the following products: