beautypg.com

13 icos, General – IDEAL INDUSTRIES ICOS HE18 User Manual

Page 13

background image

13

icos -

Installation & Servicing

GENERAL

Safety valve setting

3.0 bar

2.5 bar

2.0 bar

Vessel charge and initial

0.5

1.0

1.5

0.5

1.0

1.5

0.5

1.0

system pressure

bar

bar

bar

bar

bar

bar

bar

bar

Total water content of system

Expansion vessel volume litres

litres

25

2.1

2.7

3.9

2.3

3.3

5.9

2.8

5.0

50

4.2

5.4

7.8

4.7

6.7

11.8

5.6

10.0

75

6.3

8.2

11.7

7.0

10.0

17.7

8.4

15.0

100

8.3

10.9

15.6

9.4

13.4

23.7

11.3

20.0

125

10.4

13.6

19.5

11.7

16.7

29.6

14.1

25.0

150

12.5

16.3

23.4

14.1

20.1

35.5

16.9

30.0

175

14.6

19.1

27.3

16.4

23.4

41.4

19.7

35.0

200

16.7

21.8

31.2

18.8

26.8

47.4

22.6

40.0

225

18.7

24.5

35.1

21.1

30.1

53.3

25.4

45.0

250

20.8

27.2

39.0

23.5

33.5

59.2

28.2

50.0

275

22.9

30.0

42.9

25.8

36.8

65.1

31.0

55.0

300

25.0

32.7

46.8

28.2

40.2

71.1

33.9

60.0

Multiplying factors for
other system volumes

0.0833

0.109

0.156

0.094

0.134

0.237

0.113

0.20

8

SEALED SYSTEM REQUIREMENTS - continued

9

WATER TREATMENT

The icos boiler range have an ALUMINIUM alloy heat exchanger

IMPORTANT.

The application of any other treatment to this product may render the guarantee of Ideal

Stelrad Group invalid.
Ideal Stelrad Group

recommend water treatment in accordance with the Benchmark Guidance Notes on Water

Treatment in Central Heating systems.

Ideal Stelrad Group

recommend the use of FERNOX-COPAL or MB1,GE Betz Sentinel X100 OR Salamander Corrosion

Guard inhibitors and associated water treatment, which must be used in accordance with the manufacturers' instructions.
For further information contact:

Notes

1. It is most important that the correct concentration of the water

treatment product is maintained in accordance with the
manufacturers' instructions.

2. If the boiler is installed in an existing system any unsuitable

additives MUST be removed by thorough cleansing.

BS. 7593:1992 details the steps necessary to clean a
domestic central heating system.

3. In hard water areas, treatment to prevent lime scale

may be necessary - however, the use of artificially
softened water is NOT permitted.

4. Under no circumstances should the boiler be fired

before the system has been thoroughly flushed.

Sentinel Performance Solutions
The Heath Business & Technical Park
Runcorn
Cheshire
WA7 4QX
Tel: 0800 389 4670
www.sentinel-solutions.net

Fernox Manufacturing Co. Ltd
Cookson Electronics
Forsyth Road
Sheerwater
Woking
Surrey
GU21 5RZ
Tel: +44 (0) 1799 521133

Salamander Engineering Ltd
Unit 24
Reddicap Trading Estate
Sutton Coldfield
West Midlands
B75 7BU
Tel: +44 (0) 121 3780952

This manual is related to the following products: