Operating procedure photos – MITSUBISHI ELECTRIC MUZ-GB50VA User Manual
Page 37
37
OPERATING PROCEDURE
PHOTOS
Photo 8
6. Removing the compressor and 4-way valve
(1) Remove the top panel, cabinet and service panel.
(Refer to 1.)
(2) Remove the back panel. (Refer to 1.)
(3) Remove the inverter assembly. (Refer to 2.)
(4) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure
gauge shows 0 kg/cm
2
(0 MPa).
(5) Detach the welded part of the suction and the discharge
pipe connected with compressor. (Photo 9)
(6) Remove the compressor nuts.
(7) Remove the compressor.
(8) Detach the welded part of 4-way valve and pipe. (Photo 8)
7. Removing the reactor
(1) Remove the top panel. (Refer to 1.)
(2) Disconnect the reactor lead wire.
(3) Remove the screws of the reactor, and remove the reactor.
Photo 10
Screws of the reactor
Photo 9
Welded parts of 4-way valve
Welded part
of the dis-
charge pipe
R.V. coil
Welded part
of the suction
pipe
OB455 A--2qxp 06.7.31 2:50 PM Page 37