beautypg.com

1 startup procedure, Startup procedure -2 – MITSUBISHI ELECTRIC F940GOT-SWD-E User Manual

Page 68

background image

F940GOT-SWD-E/LWD-E

Startup 3.

3-2

3.1

Startup procedure

This paragraph describes the startup procedure from turning on of the power of the GOT to
selection of the mode.

•Perform wiring of the power supply unit of the GOT.

(Refer to Section 2.)

•Connect the GOT and the PLC with an optional connection

cable.

•Turn on the power of the GOT. When the power is turned on

while the upper left corner (which functions as a touch key)
of the screen of the GOT is pressed and held for 1 second or
more, the SET-UP MODE screen is displayed.
(Refer to "3.2 Operation environment setting".)

•The OPENING SCREEN screen indicating the model name,

etc. is displayed for the period set in "OPENING SCREEN"
on the SET-UP MODE screen.

•On the SET-UP MODE screen, set the used mode, the con-

nected PLC name, etc.
The operation environment can be set on the OTHER
MODE screen.

Perform wiring of the

power supply unit of the GOT.

Connect the PLC.

Turn on the

power without

pressing the

touch key.

Turn on the

power while

pressing the

touch key.

The OPENING SCREEN is displayed.

The SET-UP MODE screen

is displayed.

1

This manual is related to the following products: