Chapter 2 Installing the Ethernet Interface

Procedure 3: Verifying Proper Power-Up of the Ethernet Interface

Powering-up the Ethernet Interface

After configuring the Interface as explained in Procedure 2, follow the procedure below
to verify that the Ethernet Interface is operating correctly.

1.

Turn power OFF to the PLC for 3–5 seconds, then turn the power back ON. This
will initiate a series of diagnostic tests.

The OK LED will blink indicating the progress of power-up.

2.

The LEDs will have the following pattern upon successful power-up. At this time
the Ethernet Interface is fully operational and on-line.

ББББББ

ББББББ

LED

ББББББББББ

ББББББББББ

Ethernet Interface Online

ББББББ

ББББББ

OK

ББББББББББ

ББББББББББ

F (On)

ББББББ

ББББББ

LAN

ББББББББББ

ББББББББББ

F/: (On/Traffic)

ББББББ

ББББББ

SER

ББББББББББ

ББББББББББ

`

(Off)

ББББББ

ББББББ

STAT

ББББББББББ

ББББББББББ

F (On)

If STAT LED is OFF, check the PLC Fault Table. Alternatively,
use the Station Manager LOG command as explained in
GFK-1186, TCP/IP Ethernet Communications Station Manager
Manual
.

Problems During Power-up

If a problem is detected during power-up, the Ethernet Interface may not transition di-
rectly to the Operational State. If the Interface does not transistion to Operational, check
the LED pattern on the Interface and refer to Figure 2-2 to find out where the Interface
stopped. Refer to Table 2-1 for corrective actions.