beautypg.com

Agency compliance specifications, Related information, Operating environment requirements – FUJITSU T5120 User Manual

Page 21

background image

SPARC Enterprise T5120 and T5220 Servers Site Planning Guide

9

Agency Compliance Specifications

Refer to the SPARC Enterprise T5120 and T5220 Servers Safety and Compliance Guide for
a full list of agency compliance specifications.

Related Information

“Operating Environment Requirements” on page 9

Operating Environment Requirements

The operating environment requirements are the same for both the SPARC Enterprise
T5120 and T5220 servers. Your environmental control system must provide intake air
for the servers that complies with the limits specified in

“Environmental

Specifications” on page 4

.

To avoid overheating, do not direct warmed air:

Toward the front air intake of the server

Toward the server access panels

Note –

When you receive your server, place it in the environment where you will

install it. Leave it in its shipping crate at its final destination for 24 hours. This resting
period prevents thermal shock and condensation.

The servers have been tested to meet all functional requirements when operating in
the operating environmental limits presented

“Environmental Specifications” on

page 4

. Operating computer equipment in extremes of temperature or humidity

increases the failure rate of hardware components. To minimize the chance of
component failure, use the server within the optimal temperature and humidity
ranges.

Related Information

“Electrical Power” on page 10