beautypg.com

Operation, Warning – Hawk Industries Spinner Manual 550 HYDRAULIC Serial Numbers 1 to 205 User Manual

Page 17

background image

17

Operation

Operation

1. Swing Spinmaster toward pipe

until its chain is touching the
pipe tube. While continuing to
load Spinmaster (SM) against
the pipe
, push door valve (DV)
handle away from you, fully
toward the Spinmaster (Detented
Position). The doors will close
and the Spinmaster will grip the
pipe.

2. To spinning is complete, pull

out on the Air Motor Valve
Lever
(PMV), or push in on the
Hydraulic Motor Valve Lever
(HMV) depending on which unit
you are operating.

3. After the pipe shoulders,

release the motor valve and the
Spinmaster will stop.

4. To remove the Spinmaster from

the pipe, pull back on the Door
Valve Lever (DV) and pull the
Spinmaster away from the pipe.

AIR SPINNER CONTROLS

DV

DV

PMV

Warning

When gripping the Spinmaster on
the drill pipe, always keep pushing
the Spinmaster toward the pipe
while doors are closing or damage
may result to the front of the
Spinmaster.

SM

DV

HMV

HMV

HYDRAULIC SPINNER CONTROLS