Start-up procedure – Hawk Industries Hawkjaw Sr. Manual M100K-2GSR Serial Numbers 201 to 370 User Manual
Page 19
![background image](/manuals/460491/19/background.png)
1. Connect the air power source with
the Air (A) line.
2. Make sure the hydraulic reservoir is
full.
3. Connect the hydraulic Pressure (P)
and Tank (T) lines. The Pressure
line (P) Quick Disconnect is male.
4. Make sure the “E” stop (E) is pulled
out.
5. Check for hydraulic leaks. If leaks
occur, see Trouble Shooting.
6. With the exception of the hooks
retracting, no motion should occur.
If any other parts on the HawkJaw
move, see Trouble Shooting.
NOTE
Tightly connect the quick disconnects.
A loose connection causes a pressure drop
in the hydraulic fluid which heats up the
fluid and reduces component life.
NOTE
Use only Hawk approved quick
disconnects.
Part Numbers
Part Name
Part #
Male Quick Disconnect (P) 061-H52
Female Quick Disconnect (T) 061-H53
Male Air Quick Disc. (A) 061-A12M
Female Air Quick Disc. 061-A12F
Start-Up Procedure
Start-Up Procedure
A
T P
E
Operation 17