beautypg.com

Verifying site requirements, Installing the arn, Positioning the arn on a flat surface – Nortel Networks Passport ARN Routers User Manual

Page 29: Verifying site requirements -5, Installing the arn -5, Positioning the arn on a flat surface -5, Table 1-1, Installation space requirements -5

background image

Installing the ARN

114200-E Rev 00

1-5

Verifying Site Requirements

The installation site must provide a certain amount of free space around the ARN
to dissipate heat, as detailed in

Table 1-1

.

In addition, the installation site must meet the electrical and environmental
specifications listed in Appendix C.

Installing the ARN

When you are ready to install the ARN in its final location, you have two options:

Position the ARN on a flat, sturdy, horizontal surface.

Mount the ARN in an electronic enclosure rack.

Positioning the ARN on a Flat Surface

When positioning the ARN on a flat surface, make sure that the surface is:

Large enough for the ARN to operate properly

(Table 1-1)

Sturdy enough to support the combined weight of the ARN and any cables
that you connect

You should place the self-adhesive, rubber feet (shipped with the ARN) on the
bottom of the ARN chassis. These feet not only protect the surface on which you
position the ARN, they provide added friction against the weight of any cables
that you attach to the device.

Table 1-1.

Installation Space Requirements

Width

Depth (minimum)

Depth (for servicing)

22.5 in. (57.2 cm)

15 in. (38.1 cm)

25 in. (63.5 cm)

Caution:

You must use grounded electrical power outlets with the ARN.