7 node 2 (secondary/passive node) configuration, Introduction, Preliminary operations – HP VA 7400 User Manual
Page 49: Configuration procedure, Node 2 (secondary/passive node) configuration

VA 7100/7400 Cluster Installation Guide
10/12/01
46
7 Node 2 (Secondary/Passive Node) Configuration
Introduction
This chapter contains the step-by-step procedure for configuration of node 2, the secondary/passive node, of the
VA 7100/7400 disk array in a dual-path cluster configuration.
Preliminary Operations
The following preliminary operations must be successfully completed before beginning the cluster setup procedure.
1. Ensure that all requirements detailed in chapters 2 through 6 have been thoroughly reviewed and successfully
completed.
2. Ensure that storage array is powered up and maintained in accordance with the procedure of chapter 5.
3. Ensure that node 1 is powered up and running.
4. Remove node 2 from the Pause state, and allow node 2 to finish its booting.
Configuration Procedure
Perform the following procedure to configure node 2, the secondary or passive node.
1. Repeat the setup process of node 1 to set up node 2; that is, repeat the procedure of chapter 5. Check for
detection of any dynamic drives and change them to basic as performed in steps
through
of chapter 5. This
time, there is no need to pause any server, as was done with node 2 at the end of chapter 5. Ensure that the drive
letters are identical on both nodes (refer to step
of chapter 5).
2. Repeat the procedures of chapter 6 for node 2 up through step
of the
3. In the Create or Join a Cluster window shown below, select The second or next node in the cluster, then
click Next.