beautypg.com

Brick replacement instructions, Baffle removal & installation, 4100-i act wood insert – Hearth and Home Technologies 4100I-GD-B User Manual

Page 21

background image

Page 21

September 1, 2008

4100-I ACT WOOD INSERT

250-7201E

R

2

6-1/8"

2-1/4"

1

1

2

2

4

4

4

4

4

4

4

4

4

4

6

6

4

4

5

5

5

BRiCK REPlACEMENT iNSTRUCTiONS

The firebox is lined with high quality firebrick which has excep-

tional insulating properties. There is no need for a grate,

simply build a fire on the firebox of your insert.

1

. Be certain coals are completely cold. Remove all old

brick and ash from unit and vacuum out firebox.

2. Remove new brick set from box and lay out to THE

diagram as shown.

. Lay bottom bricks in unit.
4. Install rear bricks on the top of the bottom bricks. Slide

top of bricks under clip on back of firebox wall and push

bottom of brick back.

5. Install side bricks. Slide top of brick under clips on side

of firebox and push the bottom of the brick until it is flush

with the side of the unit.

BAFFLE REMOVAL & INSTALLATION

NOTE: The baffle material is 2700° Fiber Board. Removing hardware exposed to combustion processes can be frustrating. If

your reason for removing the baffle is simply to clean the chimney, you have alternatives which will save time and effort. Call

a qualified chimney sweep or an authorized Quadra-Fire dealer for details.

1. Remove all ash from firebox, and extinguish all hot embers before disposal into a metal container.
2. Remove ceramic blanket from above the baffle.
. With a /16” Allen wrench, remove 2 front manifold tube retainer bolts on the air channel under the end of the front tubes. NOTE:

Soak the bolts with penetrating oil for at least 15 minutes before trying to remove them.

Figure 21A.

4. To remove manifold tubes, slide the tube to one side until one end is out of its hole. Then, while lifting that end of the fiber board

baffle, pull tube up over the air channel and out of hole at the other end. It is necessary to remove the first two tubes in order to

remove the baffle.

NOTE: When replacing the manifold tubes, be sure the tube with the larger holes is placed in the front for

your insert to operate properly.

5. Slide fiber board baffle forward to front of stove and straight out through door.

Figure 21B.

6. To install the fiber board baffle, repeat steps 2 through 4 in reverse. Be sure the fiber board baffle and ceramic blanket are

pushed back fully into position and the ceramic blanket lays flat.

Ceramic Blanket

Baffle

Figure 21B - Baffle & Ceramic Blanket on top.

Figure 21A - Manifold tubes retaining bolt.

Allen wrench

on retainer bolt

First tube has larger holes

Item

Brick Size

Qty in Set

1

9 x 4-1/2 x 1-1/4” with hole

2

2

9 x 4 x 1-1/4” with cut

2

4-1/2 x x 1-1/4”

1

4

9 x 4-1/2 x 1-1/4”

12

5

9 x x 1-1/4”

6

9 x 1-1/2 x 1-1/4”

2

Use Part #82-0550 when ordering indi-

vidual brick and provide brick dimension

or copy this page and mark the desired

brick and take it to your authorized

dealer.

This manual is related to the following products: