2-3

Installing and Connecting the ProCurve 620 Redundant and External Power Supply

Installation Procedures

In

stal

lin
g and

Co
nnec

tin
g th

e ProCurve

620 Re

dund

ant

a

nd Ex

ternal Power Supp

ly

Installation Procedures

Summary

Follow these steps to install the 620 RPS/EPS. The rest of this chapter provides
details on these steps.

1.

Prepare the installation site (

page 2-5

).

Make sure the physical envi-

ronment into which the unit will be installed is properly prepared,
including having the correct cabling ready to connect to the unit and
having an appropriate location for the unit. See

page 2-4

for installation

precautions.

2.

Mount the unit (

page 2-5

).

The unit can be mounted in a 19-inch telco

rack, in an equipment cabinet, or on a horizontal surface.

3.

Connect devices to the unit (

page 2-8

).

Using the supplied RPS and

EPS cables, connect the unit to the devices that it will support with
redundant power or PoE power.

4.

Connect power to the unit (

page 2-9

).

Once the unit is mounted, plug

it into a nearby main AC power source.

5.

Verify the unit is operating correctly (

page 2-10

).

This is a simple

process of observing that the LEDs on the unit’s front panel indicate
correct operation.

At this point, your unit is fully installed. See the rest of this chapter if you need
more detailed information on any of these installation steps.