Installation procedures, Summary, Installation procedures -3 – HP 620 User Manual
Page 15: Summary -3, Ures
![background image](/manuals/90574/15/background.png)
2-3
Installing and Connecting the ProCurve 620 Redundant and External Power Supply
Installation Procedures
In
stal
lin
g and
Co
nnec
tin
g th
e ProCurve
620 Re
dund
ant
a
nd Ex
ternal Power Supp
ly
Installation Procedures
Summary
Follow these steps to install the 620 RPS/EPS. The rest of this chapter provides
details on these steps.
1.
Prepare the installation site (
Make sure the physical envi-
ronment into which the unit will be installed is properly prepared,
including having the correct cabling ready to connect to the unit and
having an appropriate location for the unit. See
for installation
precautions.
2.
Mount the unit (
The unit can be mounted in a 19-inch telco
rack, in an equipment cabinet, or on a horizontal surface.
3.
Connect devices to the unit (
Using the supplied RPS and
EPS cables, connect the unit to the devices that it will support with
redundant power or PoE power.
4.
Connect power to the unit (
).
Once the unit is mounted, plug
it into a nearby main AC power source.
5.
Verify the unit is operating correctly (
).
This is a simple
process of observing that the LEDs on the unit’s front panel indicate
correct operation.
At this point, your unit is fully installed. See the rest of this chapter if you need
more detailed information on any of these installation steps.