beautypg.com

Four-wire power cord – LG TurboSteam Series 27 Inch Electric Dryer User Manual and Installation Guide User Manual

Page 24

background image

24

INSTALLATION

Four-Wire Power Cord

A 4-wire connection is required for

all mobile and manufactured home

installations, as well as all new

construction after January 1, 1996.

A UL-listed strain relief is required.

Use a 30-amp, 240-volt, 4-wire,

UL-listed power cord with #10 AWG-

minimum copper conductor and closed

loop or forked terminals with upturned

ends.

1

Remove the terminal block access cover on the

upper back of the dryer.

2

Install a UL-listed strain relief into the power

cord through-hole.

3

Thread a 30-amp, 240-volt, 4-wire, UL-listed

power cord with #10 AWG-minimum copper

conductor through the strain relief.

Terminal Block

UL-Listed Strain Relief

UL-Listed 4-Wire Power

Cord

4

Transfer the dryer’s ground wire from behind the

green ground screw to the center screw of the

terminal block.

5

Attach the two hot leads of the power cord to the

outer terminal block screws.

6

Attach the white neutral wire to the center screw

of the terminal block.

7

Attach the power cord ground wire to the green

ground screw.

8

Tighten all screws securely.

9

Reinstall the terminal block access cover.

Hot (Black)

Ground Screw

Power Cord Ground

Wire

White Wire moved from

Ground Screw

Hot (Red)

Neutral (White)