Emerson Series 610 User Manual
Page 8

Installation Considerations
4
10. A breaker coordination study should be performed to ensure proper handling of fault currents.
NOTE
The instantaneous trip setting of the breaker feeding the UPS bypass input should be high
enough to accommodate short-duration overloads. The bypass static switch inside the UPS can
draw up to 10 times the system’s rated current for up to three cycles.
See also other documents in the category Emerson Tools:
- 1000VA (2 pages)
- SAG581126000 (123 pages)
- Liebert NX 10-30kVA (112 pages)
- Liebert NX 400V (132 pages)
- Nfinity 240V (44 pages)
- 10 kVA (16 pages)
- 12-20kVA (8 pages)
- NT5C06D (56 pages)
- Liebert Remote Monitoring Panel (28 pages)
- AccuVar UL94-5V (2 pages)
- PSA1000MT3-120U (2 pages)
- Liebert Power Solutions (44 pages)
- Liebert GXT2-10KIPPCBL (2 pages)
- GXT2-PP20KRT208 (36 pages)
- Liebert FS 510 VDC (2 pages)
- Libert AC Power System (4 pages)
- 250-400kVA (72 pages)
- Albr BDS-40 (2 pages)
- NXL 400 kVA (2 pages)
- PSI-XR (4 pages)
- Liebert GXT2-10000RT208 (56 pages)
- LXP48F1 (43 pages)
- LIEBERT GXT5000R-208 (32 pages)
- 650VA (2 pages)
- Liebert NX 208V (80 pages)
- 480VAC (2 pages)
- Liebert NX 480V (108 pages)
- Liebert UPStation GXT2U (40 pages)
- 7400 (67 pages)
- GXT2U (40 pages)
- Series 600 (168 pages)
- Remote Power Monitor Panel (2 pages)
- Albr BDS-256XL (2 pages)
- Packaged Drives and Engineered Systems (24 pages)
- NXL UPS Systems (48 pages)
- LIEBERT NPOWER 30-130KVA (2 pages)