Step 1. mounting the epl-1000 – PLANET EPL-1000 User Manual
Page 17
Step 1. Mounting the EPL-1000
The position and orientation of the brackets depends on the rack used for mounting. The
OLT can be front-mounted in a standard channel rack; and it can be shipped with the
mounting brackets installed in one of three mounting positions.
Mounting Bracket Orientation (Top View)
After the site requirements have been verified, the chassis may be installed at the specified
location. When mounting the chassis, practice good safety habits. Use two or more
people to secure the chassis. Relay rack mounting normally requires at least two people.
Step
Action
1
Locate the chassis and obtain the appropriate chassis mounting hardware.
2
Determine and obtain the tools required for the chassis mounting hardware.
3
From the front of the relay rack, position the chassis in its relay rack mounting
location.
4
Using the appropriate rack mounting hardware, secure the chassis in its relay
location on both left and right side of mounting bracket.
Mounting Bracket Position for Standard Mount
- 17 -