Installation, 1 pre-installation – PLANET EPL-1000 User Manual
Page 15
![background image](https://www.manualsdir.com/files/865203/content/doc015.png)
2. Installation
The followings are instructions for setting up PLANET EPL-1000. Refer to the illustration
and follow the simple steps below to quickly install your GEPON OLT.
2.1 Pre-Installation
This section provides the information users have to ware before installing the EPL-1000.
The information includes required installation tools, safety requirements, and electrostatic
discharge protection.
Tools and Test Equipment Requirements
To install and maintain the EPL-1000, you should have the tools and test equipment listed
in the 錯誤! 找不到參照來源。.
Table 2-1 Required Installation Tools and Materials
Item Required
Purpose
Anti-static wrist strap
Protect the EPL-1000 system from electrostatic
discharge damage.
Hand tools
Screw drivers for equipment removal and
replacement.
Wire cutter/stripper
Prepare wires for electrical connections.
Safety Requirement
To prevent possible serious injury, do not apply power to the EPL-1000 system until you’ve
completed all of the installation procedures and connected it to the external facilities. Be
cautious, when turning on/off the EPL-1000 system power.
- 15 -