Avago Technologies MegaRAID SAS 0260CV-4i User Manual
Page 8

Page 8
|
July 2011
MegaRAID SAS 9260CV-4i and SAS 9260CV-8i RAID Controller Quick Installation Guide
Installing the RAID Controller
NOTE: Because server and workstation chassis vary from vendor to vendor, no standard
mounting option for the CVPM01 unit exists that is compatible with the various system
configurations. Authorized resellers and chassis manufacturers can customize the
location of the power module to provide the most flexibility within various
environments.
b. With the controller on a flat, clean, static-free surface, ground yourself, and make
sure the system is grounded.
c. Remove the cable included in the RAID controller box.
d. Insert one end of the cable into the 15-pin P3 cable connector on the CVFM01
and the other end into the 15-pin P1 cable connector on the remote CVPM01, as
shown in
.
Align the recessed triangle indicators on the connectors to make sure
they are connected properly.
NOTE: The cable connectors are polarized. You can insert them into the connectors on
the flash module and the remote power module only if the rails on the cable connectors
align with the slots on the other connectors. Do not force the cable into the 15-pin
connectors. The cable end inserts into the connector with minimal resistance.
Figure 3: Connecting the CVFM01 Flash Module to the Remote CVPM01 Power Module
5. Install the RAID Controller
To install and secure the RAID controller, follow these steps.
85081-03
T/N
221038 00135
T/N 221038 00135
S/N
021038 00000140
S/N021038 00000140