Prog cal, Scal, Programming the meter ( prog ) – Precision Digital PD603 User Manual
Page 21

Sabre P Model PD603 Process Meter
Instruction Manual
21
Programming the Meter (prog)
It is very important to read the following information, before proceeding
to program the meter:
There
is
no need to recalibrate the meter when first received from
the factory.
The meter is factory calibrated prior to shipment, for all input
types, in milliamps and volts. The calibration equipment is certified
to NIST standards.
Use
the
Scale menu to scale process inputs (e.g. 4-20 mA). A cali-
brated signal source is not needed to scale the meter.
The Program menu contains the Calibrate and the Scale menus.
Process inputs may be calibrated or scaled to any display within the
range of the meter.
prog
Cal
scal