beautypg.com

Prog cal, Scal, Programming the meter ( prog ) – Precision Digital PD603 User Manual

Page 21

background image

Sabre P Model PD603 Process Meter

Instruction Manual

21

Programming the Meter (prog)

It is very important to read the following information, before proceeding
to program the meter:
 There

is

no need to recalibrate the meter when first received from

the factory.

The meter is factory calibrated prior to shipment, for all input
types, in milliamps and volts. The calibration equipment is certified
to NIST standards.

 Use

the

Scale menu to scale process inputs (e.g. 4-20 mA). A cali-

brated signal source is not needed to scale the meter.

The Program menu contains the Calibrate and the Scale menus.
Process inputs may be calibrated or scaled to any display within the
range of the meter.

prog

Cal

scal