Setup and programming – Precision Digital PD603 User Manual
Page 14

Sabre P Model PD603 Process Meter
Instruction Manual
14
SETUP AND PROGRAMMING
There
is
no need to recalibrate the meter
when first received from the factory.
The meter is factory calibrated prior to
shipment, for all input types, in milliamps and
volts. The calibration equipment is certified to
NIST standards.
Overview
There are no jumpers involved in the setup process of the meter. The
switch, located between the SIGNAL and the RJ11 connectors is not
used with the PD603 model. Setup and programming is done through
the front panel buttons.
After power and signal connections have been completed and verified,
apply power to the meter.
For
Quick User Interface Reference Guide
go to page 31