5-HYDRAULIC CONNECTION
Technical Dept. - All rights reserved - Reproduction is prohibited
PLUMBING SYSTEM CONNECTION
IMPORTANT!
The connection of the stove to the plumbing system must be carried out ONLY by specialised personnel who are
capable of carrying out installation properly in compliance with current standards in the country of installation.
The manufacturer will not be held responsible for damage to persons or property in the event of failed operation if
the aforementioned warning is not complied with.
It is important that ONLY qualified engineers are used to fit and commission the appliance in ALL cases. The installing
engineer MUST hold a QCF recognised biomass qualification. Any company using sub-contractors MUST ensure they also
hold the relevant qualifications (ONLY FOR UK).
1
DRAIN TAP
5
MALE 1/2"G DOMESTIC WATER INLET
2
SAFETY VALVE
6
MALE 3/4"G HEATING RETURN
3
FILLING TAP
7
MALE 3/4"G HEATING OUTLET
4
MALE 1/2"G HOT WATER OUTLET
Make the connections to the corresponding fittings shown in the diagram above. Make sure the pipes are not placed under tension or
undersized
IMPORTANT!!!
CLEAN THE ENTIRE SYSTEM BEFORE CONNECTING THE STOVE, IN ORDER TO REMOVE ALL RESIDUE AND DEPOSITS.
Always install shutters in the system leading to the stove so as to disconnect it from the hydraulic system should it be
necessary to move it, or when it requires routine and/or special maintenance.
Connect the stove using flexible pipes so that the stove is not excessively constrained to the system, and to allow
slight movements.