MCZ Swing HYDRO User Manual
Page 30

C
28
4-INSTALLATION AND ASSEMBLY
ASSEMBLY OF THE UPPER CERAMIC TOP
Assemble the top “C” by placing it on the four top rubber supports. The part under the ceramic top is equipped with four small cavities
corresponding with the rubber supports.
Attention! Return the front rubber supports to their original holes (see page 21)
TOP POSITIONING
See also other documents in the category MCZ Stoves:
- Powersystem (53 pages)
- Powersystem (56 pages)
- Vega '05 (Box Pellet) (61 pages)
- Boxtherm 70 Pellet (52 pages)
- Thema (76 pages)
- Ego 2.0 AIR Oyster (76 pages)
- Nasik (68 pages)
- Ego 2.0 AIR Oyster (75 pages)
- Star COMFORT AIR (60 pages)
- Kaika Oyster (57 pages)
- FC700-715 - 180+180 m3/h (17 pages)
- Flat (60 pages)
- Saturn '05 (62 pages)
- Philo (46 pages)
- Vivo 80 Pellet (61 pages)
- Tube 2013 (56 pages)
- Vivo 80 Pellet Comfort Air - 2012 (57 pages)
- Vivo 90 Pellet Comfort Air (64 pages)
- Yari MULTIAIR (55 pages)
- Polar HYDRO (65 pages)
- Suite HYDRO 22 kW High Efficiency (44 pages)
- Suite HYDRO 22 kW High Efficiency (48 pages)
- Duo HYDRO AIR High Efficiency (40 pages)
- Duo HYDRO AIR High Efficiency (52 pages)
- Flux HYDRO High Efficiency (44 pages)
- Swing HYDRO (52 pages)
- Toba HYDRO/S 22 (44 pages)
- Toba HYDRO/S 22 (52 pages)
- Vivo 80 Pellet HYDRO (74 pages)
- Zenit (27 pages)
- Veld (30 pages)
- Stripe Overnight (36 pages)
- Stub Overnight (48 pages)