MCZ Swing HYDRO User Manual
Page 27

DX2
f
f
25
4-INSTALLATION AND ASSEMBLY
Technical Dept. - All rights reserved - Reproduction is prohibited
INTERMEDIATE SIDE PANEL
Take the ceramic part marked with code DX2 and insert it into the lower hooks already fixed to the bottom ceramic part.
Insert the upper hooks and tighten the screws. Fix the two felt pads (pos.f) on the upper profile of the intermediate ceramic part.
INTERMEDIATE SIDE CERAMIC PART POSITIONING
See also other documents in the category MCZ Stoves:
- Powersystem (53 pages)
- Powersystem (56 pages)
- Vega '05 (Box Pellet) (61 pages)
- Boxtherm 70 Pellet (52 pages)
- Thema (76 pages)
- Ego 2.0 AIR Oyster (76 pages)
- Nasik (68 pages)
- Ego 2.0 AIR Oyster (75 pages)
- Star COMFORT AIR (60 pages)
- Kaika Oyster (57 pages)
- FC700-715 - 180+180 m3/h (17 pages)
- Flat (60 pages)
- Saturn '05 (62 pages)
- Philo (46 pages)
- Vivo 80 Pellet (61 pages)
- Tube 2013 (56 pages)
- Vivo 80 Pellet Comfort Air - 2012 (57 pages)
- Vivo 90 Pellet Comfort Air (64 pages)
- Yari MULTIAIR (55 pages)
- Polar HYDRO (65 pages)
- Suite HYDRO 22 kW High Efficiency (44 pages)
- Suite HYDRO 22 kW High Efficiency (48 pages)
- Duo HYDRO AIR High Efficiency (40 pages)
- Duo HYDRO AIR High Efficiency (52 pages)
- Flux HYDRO High Efficiency (44 pages)
- Swing HYDRO (52 pages)
- Toba HYDRO/S 22 (44 pages)
- Toba HYDRO/S 22 (52 pages)
- Vivo 80 Pellet HYDRO (74 pages)
- Zenit (27 pages)
- Veld (30 pages)
- Stripe Overnight (36 pages)
- Stub Overnight (48 pages)