Ab c, Installation and assembly – MCZ Boxtherm 60 Pellet User Manual
Page 24

A
B
C
22
3-INSTALLATION AND ASSEMBLY
ASSEMBLING THE COMPENSATION FRAME
Once the cladding and/or the plasterboard is set up, fit the previously removed compensation frame.
This frame is meant for finishing and covering the gap between the metal structure of the product and the cladding.
The frame is assembled by simply opening the door of the product, fitting in the frame as shown in the figure and fastening it to the lateral
columns of the structure, inside the door profile, with the four screws supplied.
4-SIDED FRAME
If the product is inserted in an existing chimney or rests on a surface, the 3-sided frame must be fitted, whereas the supplied 4-sided frame
(optional) can be fitted if the product is wall-mounted. Assembly is the same for both frames.
A - SIDE UPRIGHTS
B - FRAME
C - SCREWS