beautypg.com

Sealey AP1200R User Manual

Page 4

background image

4.11 See Fig.13. now start to build the second low level unit by

making up two end frames as shown in Fig.14. one short 'Z'

beam (C) should be fixed at the top of the angle posts and

the other short 'Z' beam (C) should be fixed at the 7th and

8th keyholes up from the bottom of the angle posts as shown

below. Ensure that each 'Z' beam is facing upwards. Tap the

beam at either end, close to each angle post to ensure that

the rivets are seated at the bottom of the keyhole slots.

4.12

See Fig.14. Join the two end frames together using the

four remaining long 'Z' beams as shown above. Ensure

that each 'Z' beam is facing upwards. Tap the beams at

either end, close to each angle post to ensure that the rivets

are seated at the bottom of the keyhole slots.

4.13 See Fig.15. Lay the shelves into position between the 'Z'

beams as shown above.

4.14 See Fig.16. Place the two units end to end as shown below

and join them together using the 2 post clips (F). Insert a

post cap (E) into the top of each 'A' post.

01284 757500

01284 703534

[email protected]

Sole UK Distributor

Sealey Group,

Bury St. Edmunds, Suffolk.

www.sealey.co.uk

Web

email

4.10 HALF HEIGHT STORAGE STATION. See Fig.12. Follow

steps 4.2 and 4.3 to create a bottom frame with four 'A' posts

attached. using two long 'Z' beams (B) and two short 'Z'

beams (C) insert a shelf support level at the top of the angle

posts (A). Tap the beams at either end, close to each angle

post to ensure that the rivets are seated at the bottom of the

keyhole slots. Insert another shelf support level at the desired

height within the frame using additional long and short 'Z'

beams and ensure that the rivets are seated at the bottom of

the keyhole slots.

Fig.12

Fig.13

Fig.15

Fig.14

Fig.16

AP900r, AP1200r Issue: 1 - 05/06/09

This manual is related to the following products: