Fig.4 fig.5 fig.6 fig.8, Fig.7 – Sealey AP1200R User Manual
Page 2

4.2
See Fig.4. Support two upright angle posts (A) in a vertical
position ensuring that the keyhole slots are pointing
downwards. Join them together at the base using a short 'Z'
beam (C) ensuring that the shelf support is facing upwards.
Tap the beam at either end, close to each angle post to
ensure that the rivets are seated at the bottom of the keyhole
slots.
4.3
See Fig.5. Continue to assemble the complete bottom frame
in the order indicated above in Fig.5 starting with a long 'Z'
beam (B). Ensure that each 'Z' beam is facing upwards. Tap
the beam at either end, close to each angle post to ensure
that the rivets are seated at the bottom of the keyhole slots.
4.4
See Fig.6. now make up an upper end frame by connecting
two angle posts together at the top with a short 'Z' beam (C).
Tap the beam at either end to ensure that the rivets are
properly seated at the bottom of the keyhole slots. Take a
second short 'Z' beam and insert the top rivets into the
bottom keyholes,
Only use the top rivets, the bottom rivets
will be used to join the bottom and upper frames. Make
up a second upper end frame using the remaining two angle
posts and a two short 'Z' beams.
4.6
See Fig.8. Stabilise the frame assembly by inserting a
shelf support halfway up the frame. As each 'Z' beam is
added ensure that the top rivets are inserted into the bottom
keyholes of the upper frame and the lower rivets are inserted
into the top keyholes of the bottom frame as shown below.
Tap the beams at either end to ensure that the rivets are
properly seated into the keyholes.
Fig.4
Fig.5
Fig.6
Fig.8
AP900r, AP1200r Issue: 1 - 05/06/09
4.5
See Fig.7. Join the upper and bottom end frames together
using the open rivets on the short 'Z' beam (C) see detail in
fig.7.
Fig.7