4.9
See Fig.11. Insert a post cap (E) into the top of each angle
post 'A' as shown below. Lay a shelf 'D' in between the 'Z'
beams at each level created (See lower detail in Fig.12).
4.8
See Fig.10. Build one shelf support in the top half of the
frame and one shelf support in the bottom half of the frame
at the heights required. (The keyholes allow adjustment in
38mm/1 1/2" increments). Ensure that the beams are the
right way up with the shelf support at the top. Tap the beams
at either end to ensure that the rivets are properly seated into
the keyholes.
4.7
See Fig.9. now stabilise the top part of the frame by adding
two long 'Z' beams (B) to make a shelf support at the top of
the frame as shown in Fig.9. Ensure that the beams are the
right way up with the shelf support at the top. Tap the beams
at either end to ensure that the rivets are properly seated
into the keyholes.